PROJECT
MESAIEED INDEPENDENT POWER PLANT
PROJECT OWNER | MPOWER (MESAIEED POWER COMPANY)
CLIENT | IBERDROLA
DURATION | 2008 - 2011

PROJECT SCOPE
Fabrication of more than 1000 Tons, and the Installation of circa 2000 Tons of Various Steel Structures.
PROJECT HIGHLIGHTS
​​
-
Scope of project works included the Detail Engineering, Fabrication and Installation of large structures as the Auxiliary Boiler Building, Electro Chlorination Plant, Ammonia Tank Shelter and Boiler Room. It also included the fabrication and installation of Pipe Supports, Hot Dip Galvanized Structures, Platforms and Gratings.
-
Led the company to become the main mechanical contractor for structural steel erection on the project out of 4 contractors originally working onsite. ​
​
-
Managed to increase the original scope of supply and contract value by more than 240% from the original contract value.